> 2.3 SDE could do that, but i don't get 6. a 24/7 operation needs 2FTE and 1 PTE per shift, and there are three shifts.
having the team constantly on call is a recipe for having them quit. sure, you could run this with the bare minimum number of engineers, but your turnover would be so high and given how high hiring costs tend to be, this is a net negative
> so maybe all that "busywork" takes 6 full times?
ktlo in a constantly changing company is not easy. software / host patching to maintain compliance is necessary busywork that requires a bit of babysitting. not to mention keeping up with required migrations to new stuff due to internal deprecations.
having the team constantly on call is a recipe for having them quit. sure, you could run this with the bare minimum number of engineers, but your turnover would be so high and given how high hiring costs tend to be, this is a net negative
> so maybe all that "busywork" takes 6 full times?
ktlo in a constantly changing company is not easy. software / host patching to maintain compliance is necessary busywork that requires a bit of babysitting. not to mention keeping up with required migrations to new stuff due to internal deprecations.