iirc all the bids for a concrete version (ala Florida) were twice as much for the steel design that was used, otoh California version also has to be earthquake resistant. I gotta give credit to all the engineering firms and Caltrans oversight. Very little downtime on 280, that would have been a traffic nightmare for entire peninsula.